Modernization works of Solid Bulk Terminal of Puerto Cortes, Honduras
Puerto Cortes
Location: Puerto Cortes (Honduras)
Developer: Banco Atlántida, S.A.
Budget: 34.870.486,08 $USD
Execution time: 23 months
Characteristics
The aim of the work is to improve the capacity and efficiency of the bulk terminal operations, reduce operating costs and unload time. The works are summarized as follows:
Restore dock No. 3: demolition of part of the superstructure and replacement of deteriorated structural elements. Repair concrete piles.
Enlarging dock No. 3: extension of the current dock with a 215 m long and 22.20 m wide piled structure.
Setting out the rear storage area: Land reclamation and consolidation treatment with stone columns and preload. Installations: drainage, water supply, electricity supply and lighting. Paving roads and yards and fencing.
The key figures of the works are:
Steel Piles: 252 uds.
Reclamation with quarry material: 39.000 m³.
Riprap 500-700 kg: 51.500 Tn.
Dredging: 10.800 m³.
Stone columns: 3.000 ml.
Demolition concrete slab: 2.400 m².
Existing reinforced concrete piles repair: 49 uds.
In situ and precasted elements
Steel reinforcement: 1.800.000 kg.
Concrete: 8.000 m³.
Formworks: 13.200 m².
Bituminous pavement: 17.000 m².
Stone pavement: 4.000 m².
Home > Proyects > Docking and Mooring Works > Modernization works of Solid Bulk Terminal of Puerto Cortes, Honduras
The Docking and Mooring Works, the so-called Wharves, allow ships or vessels to approach in the protected area between land and sea to carry out port activities, such as loading and unloading goods, and passenger and provisions transport, among others.
View all
Level space and commercial quays sheltered by Botafoc Breakwater at Ibiza Port
Ibiza

Southern Quay of the Southern Dock of the Sagunto Port
Valencia

Quay Prat construction, Barcelona Port, Phase I
Barcelona

Bulk Cargo Terminal Infrastructure, Phase I
Ploce (Croacia)

Modernization works of Solid Bulk Terminal of Puerto Cortes, Honduras
Puerto Cortés

Berth for large vessels at the docks of Poniente. Palma de Mallorca
Mallorca

Cruise dock in the Port of Valencia Extension, Phase I
Valencia

Western Quay southern stretch Sagunto Port extension
Valencia

Strengthening and upgrading of the first section of Muelle de Levante in the Port of Valencia
Valencia

Valencia Port Inner Dock Customs Quay widening (America’s Cup 2007)Valencia Port Inner Dock Customs Quay widening (America’s Cup 2007)
Valencia

Lineal quay in north shore of Gandía Port. “Los Borgia” quay
Valencia