Southern Quay of the Southern Dock of the Sagunto Port
Sagunto, Valencia
Location: Sagunto, Valencia (Spain)
Developer: APV
Budget: 70.478.795,07 €
Execution time: 29 months
Characteristics
Execution of a 889 m long and 16.5 m deep new quay by means of floating caissons and granular filling in an area of 70 Ha.
The key figures of the works are:
Dredging: 6.460.870 m3
General granular filling: 6.748.480 m3
Rubble mound bedding layer, Riprap: 935.000 t
Reinforced Concrete floating caissons: 22 uds.
Quay superstructure:
Reinforced concrete HA-30: 9.251 m3
Steel frame: 475.418 kg
Asphaltic concrete: 22.311 t
Home > Proyects > Docking and Mooring Works > Southern Quay of the Southern Dock of the Sagunto Port
The Docking and Mooring Works, the so-called Wharves, allow ships or vessels to approach in the protected area between land and sea to carry out port activities, such as loading and unloading goods, and passenger and provisions transport, among others.
View all
Level space and commercial quays sheltered by Botafoc Breakwater at Ibiza Port
Ibiza

Southern Quay of the Southern Dock of the Sagunto Port
Valencia

Quay Prat construction, Barcelona Port, Phase I
Barcelona

Bulk Cargo Terminal Infrastructure, Phase I
Ploce (Croacia)

Modernization works of Solid Bulk Terminal of Puerto Cortes, Honduras
Puerto Cortés

Berth for large vessels at the docks of Poniente. Palma de Mallorca
Mallorca

Cruise dock in the Port of Valencia Extension, Phase I
Valencia

Western Quay southern stretch Sagunto Port extension
Valencia

Strengthening and upgrading of the first section of Muelle de Levante in the Port of Valencia
Valencia

Valencia Port Inner Dock Customs Quay widening (America’s Cup 2007)Valencia Port Inner Dock Customs Quay widening (America’s Cup 2007)
Valencia

Lineal quay in north shore of Gandía Port. “Los Borgia” quay
Valencia